2-2-3 Schedule Generator

Work 2, off 2, work 3 — the 2-2-3 rotation behind the Panama and Pitman schedules. Set your start date and see your shifts, your long weekends and your estimated pay, months ahead.

Your 2-2-3 calendar

Day 1 is the first of the opening 2 work days.
Pitman crews: pick your fixed shift. Panama crews rotate — generate one calendar per rotation block.
Add this to see estimated gross pay per month.
Applied to night hours when the shift type is Night.
Calendar color key — the calendar colors each day automatically from the pattern and start date. These are not buttons: Day shift Night shift Day off

Pay figures are estimates from the schedule alone — overtime premiums, bonuses, taxes and deductions are not included. Verify a real stub with the shift differential calculator.

How the 2-2-3 schedule works

The 2-2-3 is one of the most common rotating schedules in healthcare, manufacturing, public safety and warehousing. The name is the pattern: in each 14-day cycle you work 2 days, take 2 off, work 3, take 2 off, work 2, and take 3 off — then it repeats.

WorkWork OffOff WorkWorkWork OffOff WorkWork OffOffOff

That is 7 shifts per 14 days. With the usual 12-hour shifts you work 84 hours per cycle — an average of 42 hours a week, split unevenly: one week of the cycle carries 36 hours, the other 48, which is why the heavy week often includes overtime.

Every other weekend off

The feature workers love most: the 3-day blocks alternate. One cycle your 3 work days cover the weekend; the next cycle your 3 days off do. The result is a full long weekend off every other week, guaranteed by the pattern itself — no swapping, no favors. When you generate your calendar above, the long pale runs of "Off" over Friday to Sunday are those weekends. Plan around them.

Panama vs Pitman: same pattern, different crews

You will hear this pattern called both the Panama schedule and the Pitman schedule. The work/off rhythm is identical — the difference is in how crews are assigned to day and night shifts. On a Panama schedule, crews rotate between day and night shifts over time. On a Pitman schedule, each crew is fixed: you work either days or nights, and you stay there. In the generator above, the shift-type selector covers both — fixed Pitman night crews should choose Night; rotating Panama crews can generate a calendar for each block of their rotation.

2-2-3 schedule: pros and cons

What workers like

  • Every other weekend fully off, built into the pattern.
  • Never more than 3 shifts in a row — the stretches stay short.
  • Only 7 shifts per 14 days; half your days are off.
  • Simple rhythm that families can learn and plan around.

What workers struggle with

  • No long break: the longest stretch off is 3 days, so real vacations need leave.
  • The 48-hour week can be tiring, and the 36/48 split makes pay vary between checks.
  • On rotating (Panama) versions, switching between days and nights is hard on sleep.
  • Midweek days off do not always match family and school schedules.

Want the long week off instead? Look at the DuPont schedule generator, or compare patterns side by side in the shift schedule calculator.

Frequently asked questions

How does the 2-2-3 schedule work?

The 2-2-3 schedule repeats every 14 days: work 2 days, off 2 days, work 3 days, off 2 days, work 2 days, off 3 days. You work 7 shifts per cycle — at 12 hours each that is 84 hours per two weeks, an average of 42 hours per week.

What is the difference between the Panama and Pitman schedules?

Both names describe the same 2-2-3 pattern of work and rest days. The difference is how crews handle day and night shifts: Panama crews rotate between days and nights, while Pitman crews stay fixed on either day shift or night shift. In this generator, the day/night choice is the shift type selector — pick Night for a fixed Pitman night crew.

Do you get every other weekend off on a 2-2-3 schedule?

Yes — that is the pattern's best-known feature. The 3-day block in each cycle alternates between a working weekend and a long weekend off, so you get every other weekend completely off, plus a two-day break in the other weeks.

How many hours a week is the 2-2-3 schedule?

An average of 42 hours per week with 12-hour shifts: 7 shifts × 12 hours = 84 hours per 14-day cycle. One week of the cycle has 36 hours and the other has 48, which is why overtime shows up in the heavier week for many workers.

How do I set the start date for my 2-2-3 rotation?

Day 1 of the cycle in this generator is the first of the opening 2 work days. Pick a date you know began a work block and use it as the start date. If the calendar looks shifted against your real roster, move the start date a day or two until your known shifts line up.