DuPont Schedule Generator

The DuPont rotation runs on a 28-day cycle that never matches the calendar month. Set your cycle's start date below and see your shifts — including every 7-day break — laid out for the months ahead.

Your DuPont calendar

Day 1 is the first of your four night shifts.
Add this to see estimated gross pay per month.
Calendar color key — the calendar colors each day automatically from the pattern and start date. These are not buttons: Day shift Night shift Day off

Pay figures are estimates from the schedule alone — overtime premiums, bonuses, taxes and deductions are not included. Verify a real stub with the shift differential calculator.

The 28-day DuPont cycle, explained

The DuPont schedule was developed for round-the-clock operations — it takes its name from the DuPont company, whose plants used it for continuous production. Four crews rotate through the same 28-day pattern, so the job is covered 24 hours a day while every crew gets the same mix of days, nights and rest.

One full cycle looks like this:

NNNN OffOffOff DDD Off NNN OffOffOff DDDD OffOffOffOffOffOffOff
BlockWhat it is
4 nights, 3 offThe cycle opens with four night shifts, then a short break.
3 days, 1 offThree day shifts, a single day off, then back to nights.
3 nights, 3 offThree more night shifts and another short break.
4 days, 7 offFour day shifts finish the working part of the cycle — then the famous full week off.

Add it up and you work 14 shifts per 28-day cycle. At the usual 12-hour shift that is 168 hours per cycle, an average of 42 hours per week. The average hides the swing, though: your heaviest stretch packs 7 shifts into 8 days, while the break week has none at all.

The 7-day break

The seven consecutive days off at the end of every cycle — often called the long break or long change — are why many workers defend this schedule fiercely. A full week off, four times every 16 weeks, without using any vacation time: that is when DuPont crews take their trips, do their hunting and fishing, and handle the life admin that rotating shifts make difficult. When you generate your calendar above, look for the long runs of pale "Off" days — those are your long breaks, and you can plan around them months ahead.

DuPont schedule: pros and cons

What workers like

  • A full 7-day break every 28 days, built into the rotation.
  • Only 14 shifts per cycle — half the days in the month are yours.
  • Predictable for years ahead: the cycle just repeats, so long-range planning is easy with a generator like this one.
  • Built-in overtime: the 42-hour average week means regular premium hours in heavy weeks.

What workers struggle with

  • Frequent flipping between day and night shifts, which is hard on sleep.
  • Brutal stretches: 7 shifts in 8 days around the middle of the cycle.
  • Short breaks of 1–3 days that are more recovery than rest.
  • Weekends land where the cycle puts them — roughly half are working weekends.

On a different rotation? Try the 2-2-3 schedule generator, or compare all patterns in the shift schedule calculator.

Frequently asked questions

How does the DuPont schedule work?

The DuPont schedule is a 28-day rotation for four crews covering a job around the clock. Each cycle runs: 4 night shifts, 3 days off, 3 day shifts, 1 day off, 3 night shifts, 3 days off, 4 day shifts, then 7 days off. The pattern then repeats from the top.

How many hours do you work on a DuPont schedule?

You work 14 shifts in each 28-day cycle. At 12 hours per shift that is 168 hours per cycle, which averages 42 hours per week. Because the cycle is four weeks long, some individual weeks are much heavier — up to 72 hours — and the 7-day break week has none.

What is the 7-day break on the DuPont schedule?

At the end of every 28-day cycle you get seven consecutive days off — often called the long break or long change. It is the DuPont schedule's best-known feature: a full week to recover, travel or handle family life, four times every 16 weeks.

How do I set the start date for my DuPont rotation?

In this generator, day 1 of the cycle is the first of the four night shifts. Find a date you know you started a run of four nights and use it as the start date. If your crew's rotation is offset, shift the start date forward or back a few days until the calendar matches your known shifts.

Is the DuPont schedule hard on sleep?

It can be. The DuPont rotation switches you between day and night shifts several times per cycle, which many people find harder than staying on one shift. The long stretches — four nights in a row, and a full week off every cycle — are designed to soften that, but the day/night flipping is the main complaint about this schedule.